冷再生路拌機(jī)施工要點(diǎn)解析

來(lái)源:http://www.iz8.com.cn/ 日期:2025-06-11 發(fā)布人:

  冷再生路拌機(jī)作為一種、的路面修復(fù)設(shè)備,通過(guò)銑刨、破碎、拌合及攤鋪一體化作業(yè),實(shí)現(xiàn)舊瀝青路面材料的再生利用。其施工要點(diǎn)涵蓋設(shè)備選型、工藝控制、質(zhì)量檢測(cè)及措施四大核心環(huán)節(jié),直接決定工程效率與路面性能。

  As an efficient and environmentally friendly road surface repair equipment, the cold recycling road mixer achieves the recycling of old asphalt pavement materials through integrated operations of milling, crushing, mixing, and paving. The key points of its construction include equipment selection, process control, quality inspection, and environmental protection measures, which directly determine the efficiency of the project and the performance of the road surface.

  一、設(shè)備選型與調(diào)試

  1、 Equipment selection and debugging

  機(jī)型匹配原則:根據(jù)工程規(guī)模、舊路結(jié)構(gòu)及再生深度選擇設(shè)備。例如,小型冷再生機(jī)適用于村道維修,而大型設(shè)備可處理高速公路基層,銑刨寬度覆蓋2-4米,深度可達(dá)50cm。

  Model matching principle: Select equipment based on project scale, old road structure, and regeneration depth. For example, small cold recycling machines are suitable for village road maintenance, while large equipment can handle highway base layers, with milling widths covering 2-4 meters and depths up to 50cm.

  刀頭與刀庫(kù)配置:針對(duì)舊瀝青路面或水泥穩(wěn)定基層,需選用不同材質(zhì)刀頭。例如,硬質(zhì)合金刀頭適用于高強(qiáng)度基層,而鑲齒刀頭則更適合瀝青路面銑刨。

  Knife head and knife magazine configuration: Different materials of knife heads need to be selected for old asphalt pavement or cement stabilized base. For example, hard alloy cutting heads are suitable for high-strength substrates, while toothed cutting heads are more suitable for milling asphalt pavement.

  核心部件檢查:施工前需校驗(yàn)銑刨鼓轉(zhuǎn)速、拌合葉片角度及行走速度,確保再生料級(jí)配符合設(shè)計(jì)要求。

  Core component inspection: Before construction, it is necessary to verify the milling drum speed, mixing blade angle, and walking speed to ensure that the gradation of recycled materials meets the design requirements.

  二、施工工藝控制

  2、 Construction process control

  舊路預(yù)處理:

  Pre treatment of old roads:

  路面雜物,對(duì)嚴(yán)重車(chē)轍或裂縫進(jìn)行預(yù)銑刨,確保再生層厚度均勻。

  Remove road debris, pre mill severe ruts or cracks to ensure uniform thickness of the regeneration layer.

  采用雷達(dá)探測(cè)技術(shù)識(shí)別地下管線(xiàn),避免施工損傷。

  Using radar detection technology to identify underground pipelines and avoid construction damage.

  添加劑精準(zhǔn)投放:

  Accurate addition of additives:

  根據(jù)舊料級(jí)配及含水率,計(jì)算水泥、乳化瀝青或泡沫瀝青的摻量。例如,水泥劑量通??刂圃谂f料質(zhì)量的1.5-3%。

  Calculate the amount of cement, emulsified asphalt or foam asphalt according to the old material gradation and water content. For example, the cement dosage is usually controlled at 1.5-3% of the old material quality.

  采用計(jì)算機(jī)控制系統(tǒng)實(shí)現(xiàn)添加劑的連續(xù)、均勻噴灑,誤差控制在±0.5%以?xún)?nèi)。

  Using a computer control system to achieve continuous and uniform spraying of additives, with an error controlled within ± 0.5%.

  拌合與整平:

  Mixing and leveling:

  控制銑刨速度與拌合深度,確保再生料混合均勻。

  Control milling speed and mixing depth to ensure even mixing of recycled materials.

  使用平地機(jī)進(jìn)行初步整平,再通過(guò)再生機(jī)自帶螺旋布料器實(shí)現(xiàn)二次精平。

  Use a grader for preliminary leveling, and then achieve secondary precision leveling through the built-in spiral feeder of the recycling machine.

  碾壓工藝:

  Rolling process:

  初壓采用鋼輪壓路機(jī)靜壓1-2遍,復(fù)壓使用振動(dòng)壓路機(jī)振壓3-4遍,終壓以膠輪壓路機(jī)收面。

  The initial compaction uses a steel wheel roller for 1-2 passes of static pressure, the secondary compaction uses a vibrating roller for 3-4 passes of vibration, and the final compaction uses a rubber wheel roller for finishing.

  碾壓溫度需控制在80-110℃,避免低溫下壓實(shí)度不足。

  The compaction temperature should be controlled between 80-110 ℃ to avoid insufficient compaction at low temperatures.

  三、質(zhì)量檢測(cè)與驗(yàn)收

  3、 Quality inspection and acceptance

  過(guò)程檢測(cè):

  Process detection:

  實(shí)時(shí)監(jiān)測(cè)再生料含水率、級(jí)配及添加劑摻量,確保符合JTG/T 5521-2019《公路瀝青路面再生技術(shù)規(guī)范》。

  Real time monitoring of moisture content, gradation, and additive dosage of recycled materials to ensure compliance with JTG/T 5521-2019 "Technical Specification for Highway Asphalt Pavement Recycling".

  采用核子密度儀檢測(cè)壓實(shí)度,每200米檢測(cè)1處,合格率需達(dá)95%以上。

  Using a nuclear density meter to detect compaction, one point should be tested every 200 meters, and the pass rate should be above 95%.

  成品驗(yàn)收:

  Finished product acceptance:

  鉆芯取樣檢測(cè)再生層厚度、強(qiáng)度及平整度。

  Drill core sampling to detect the thickness, strength, and flatness of the regeneration layer.

  進(jìn)行彎沉試驗(yàn)及滲水系數(shù)測(cè)試,確保路面承載力與耐久性達(dá)標(biāo)。

  Conduct deflection tests and permeability coefficient tests to ensure that the road surface's bearing capacity and durability meet the standards.

  防護(hù):

  Security protection:

  設(shè)置警示標(biāo)志與導(dǎo)流設(shè)施,作業(yè)區(qū)封閉管理。

  Set up warning signs and diversion facilities, and implement closed management of the work area.

  操作人員需佩戴防塵口罩、耳塞及帽,定期接受設(shè)備操作培訓(xùn)。

  Operators are required to wear dust masks, earplugs, and safety helmets, and receive regular equipment operation training.

20220121045236895.jpg

  四、特殊工況應(yīng)對(duì)策略

  4、 Special working condition response strategy

  低溫施工:

  Low temperature construction:

  當(dāng)環(huán)境溫度低于10℃時(shí),需采用溫拌添加劑或?qū)εf料進(jìn)行預(yù)熱處理。

  When the ambient temperature is below 10 ℃, warm mix additives or preheating treatment of old materials should be used.

  縮短再生料從拌合到碾壓的時(shí)間,避免溫度散失過(guò)快。

  Shorten the time from mixing to rolling of recycled materials to avoid rapid temperature loss.

  高含水率舊料:

  High moisture content old materials:

  通過(guò)翻曬或摻入干料調(diào)整含水率,確保再生料處于壓實(shí)狀態(tài)。

  Adjust the moisture content by flipping or adding dry materials to ensure that the recycled material is in the best compacted state.

  交通導(dǎo)改:

  Traffic modification:

  采用半幅施工、半幅通車(chē)方案,通過(guò)錐形標(biāo)、水馬等設(shè)施劃分作業(yè)區(qū)。

  Adopting a half width construction and half width traffic plan, the work area is divided by facilities such as conical markers and water horses.

  冷再生路拌機(jī)施工需構(gòu)建“設(shè)備-工藝-檢測(cè)-”四位一體管控體系,通過(guò)精細(xì)化操作與實(shí)時(shí)監(jiān)測(cè),確保再生路面質(zhì)量。隨著綠色公路建設(shè)理念的深化,冷再生技術(shù)將向“智能化控制、全深度再生、多材料適配”方向發(fā)展,為道路維修提供更、可持續(xù)的解決方案。

  The construction of cold recycling road mixer requires the establishment of a four in one control system of "equipment process testing environmental protection", which ensures the quality of recycled road surface through refined operation and real-time monitoring. With the deepening of the concept of green highway construction, cold recycling technology will develop towards "intelligent control, full depth recycling, and multi material adaptation", providing more efficient and sustainable solutions for road maintenance.

  本文由冷再生機(jī)租賃友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://www.iz8.com.cn真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://www.iz8.com.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

閱讀/ Recommended reading

  在道路養(yǎng)護(hù)與建設(shè)的領(lǐng)域中,冷再生機(jī)正扮演著愈發(fā)關(guān)鍵的角色。對(duì)于眾多施工項(xiàng)目而言,租賃冷再生機(jī)相比購(gòu)置設(shè)備,恰似手握一根 “省錢(qián)省力魔法棒”,諸多優(yōu)勢(shì)令人難以拒絕?! n t...

冷再生機(jī)租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
舊路翻新 “神器” 大盤(pán)點(diǎn):那些給力的冷再生機(jī)型號(hào) 2025-06-20
揭秘冷再生機(jī)的 “體型密碼”:租賃尺寸選擇攻略 2025-06-18
怎么找到靠譜的冷在生租賃公司? 2025-06-17

產(chǎn)品/ Recommended products